Day of Framing

Dining room

2 missing 7/8th nuts and tighten down

Corner

SR backing at corner beam

SR backing above door at header

Add missing block

(10’+ spans need blocks)

Add strap at top plate

Add blocks at left corner

Nail sheer pattern in ply outside

Add strap at top plate

Add missing stud.

Tighten new glued HD

Kitchen

Strap sheer wall to double top plate

Fur out studs at sheer panel right

Nail off sheer panel to top plate

Check nailing on sheer wall

Great room

A35 x 3 to beam area

Fix A35 at door opening

Strap large Glulam to LVL

Check for missing hardware for big window rake wall.

A35s

Strap left

Strap right

Tighten corner holddowns

Nail off king stud top

Check plate breaks

Rear portch

Remove braces

Shave off bolts too deep counter sink

Flush facia with 3 blue screws

Entry

5 A35s and 5 H1s at outlookers

Strap wall at beam w no top plate

Shave bolts x8

Sheer beam

Closet

Strap wall to header front

Master bath

7/8th but on hold down

Corner backing

Master bedroom

7/8th but on hold down

Strap header x3 (one extra long one 3-4’)

Strap corner at short wall

Corner backing

Stairs

Fill in 3 knee wall areas

Add toe kickers x2

Block upper area/sheet

Ledger to back

Fur strip wall area

Upstairs

Fur up headers x 3

Fur corner at sheer wall

Add backer at peak